SAP中物料单位更改处理案例

您所在的位置:网站首页 sap中的cogi最好的处理方法 SAP中物料单位更改处理案例

SAP中物料单位更改处理案例

2023-06-30 18:46| 来源: 网络整理| 查看: 265

关于SAP物料单位的更改,网上前辈有篇文章写的比较详细,如果有兴趣详细了解,可以参考!给出链接如下:【转载】SAP物料基本计量单位的更改_少年休闲海-CSDN博客_sap物料不同计量单位转换

刚好笔者遇到类型问题,技术部负责物料主数据基础视图及BOM维护的同事提出,原价格单位设为PC,需要修改为KG。但系统提示无法修改,并给出截图如下:

笔者之前有处理过物料类型修改的经验。从逻辑上本能的推断是,物料建立后,应该产生了一些关联信息。所以,如果更改了主数据中的物料单位,那么关联信息中的单位怎么办?两者之间就会产生矛盾。所以,SAP的处理逻辑是先清理掉关联信息,再修该物料主数据的基本单位。由于物料的关联信息在系统中可能会存在很多。比如物料BOM,工艺路线,采购文档,生产文档,销售文档,物料库存等。所以,该问题分为两种情况:

1、物料创建就较早发现问题。此时,其关联文档可能还没有产生或者很少。处理起来就相对简单一些;

2、和第一种情况不同,物料创建很久后才发现问题。但笔者认为这种情况并不多见。因为在SAP的处理链过程中,单位上的错误,用户在处理时应该是很容易发现。当然,如果仍然发现不及时,产生了较多后续文档。那就需要完整的按照SAP Note来处理了。下面引用了一段SAP NOTE针对物料单位变更的处理建议:

根据SAP Note: 138767,更改物料度量单位时,系统会进行以下检测:

The base unit must not be defined as an alternative unit of measure for the material No International Article Number must be assigned to the base unit No proportion/product units must be defined for the material No configurable material must be assigned The material must not be used as a configurable material Stock must neither exist for the previous period nor for the current period No physical inventory must be active No reservations or dependent requirements must exist for which the deletion indicator is not set No planned orders must exist No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set No WM transfer requirements, no WM quants or no WM posting change notices must exist The material must not be a bill of material The material must not be contained in a bill of material The material must not be used as a production resource/tool The material must not be used in task lists No standard cost estimate must exist for the current or future period No production orders must exist No planned independent requirements must exist No run schedule headers must exist If the base unit has dimensions, no serial number profile must be assigned No sales and distribution documents must exist which have status Not processed or Partially processed.

如果存在前期库存,根据SAP Note: 30656的提示,需:

1,Post the same amount to current period stock (for example, using movement type 561) so that previous period stock and current period stock are identical.

2,Make a withdrawal posting in the previous period for the stock together with posting date (for example, using movement type 562).

基于SAP Note中的内容,有一个比较直观的感觉,太复杂了。并且这种处理涉及的部门太多,可能关联财务控制,物流,采购,销售等部门,处理起来就更难了。所以,笔者认为还是要加强培训沟通,利用管理手段去最大程序的杜绝此类情况的发生才是最好的方法。

回到笔者的案例中来,接到用户问题后,通过用户沟通和查询,发现该物料于当天创建,其后续文档并不多,只是有一个BOM数据。由于该物料是原材料。通过CS15反查到其所处的BOM位置。然后指导用户将该物料从成品BOM中暂时先拿掉。之后,再尝试修该单位。

下图中物料主数据修改记录显示,物料单位由PC己修改为KG。



【本文地址】


今日新闻